• News
Improvements to safety of rocky slope overhanging Place d’Armes

Improvements to safety of rocky slope overhanging Place d’Armes

4 OCTOBER 2024
NEWS
TRANSPORT AND MOBILITY
NEWS RELEASE

The initial phase of the work will begin on Thursday 3 October at the bottom of Rampe Major, near the police station. There will be no impact on pedestrians.

In parallel, ahead of the subsequent phases, a temporary protective walkway will be installed on the pavement that runs along the rocky slope between the "Place d’Armes" bus stop at the bottom of the Rampe Major and the Boulevard Charles III bus stop. 

The walkway will be installed between 7 pm and 1 am in the morning from 7 October to 8 November. When necessary, pedestrians will be assisted by a control barrier and a traffic officer. Every precaution will be taken to reduce the noise impact of this work.

The walkway will make it possible to keep traffic flowing and pedestrians safe throughout the duration of the work, which will continue on this portion of the glacis until 20 December 2024.
 

Related news

Renouvellement de votre estampille en ligne

Renouvellement de votre estampille en ligne

15 October 2024

Gagnez du temps et renouvelez votre estampille via le téléservice dédié !
NEWS
TRANSPORT AND MOBILITY

Monabike: New bikes

9 October 2024

Monabike is extending its range of bikes!
NEWS
TRANSPORT AND MOBILITY
Public Highways: current and future closures

Public Highways: current and future closures

9 October 2024

Information on scheduled closures to help you plan your journeys!
NEWS
TRANSPORT AND MOBILITY