Road repair on Boulevard des Moulins
Road repair of the entire road surface of Boulevard des Moulins from 1 July to 6 September 2024 .
The project will be carried out in several stages:
- Preparatory work from 1 to 26 July from 8 am to 5 pm. The road will remain open to traffic thanks to a manual traffic control system during the day and traffic lights at night
- Planing and application of the road base asphalt from 29 July to 2 August at 6 am. Work will be carried out at night to minimise the impact on traffic (traffic will be stopped during the work)
- Repairs to peripheral gutters from 5 to 27 August from 8 am to noon and from 1 pm to 7 pm. The road will remain open to traffic thanks to a manual traffic control system during the day and traffic lights at night
- Surfacing of the boulevard from 27 to 28 August from 8 pm to 6 am. Work will be carried out at night to minimise the impact on traffic (traffic will be stopped during the work)
- Re-levelling of manhole covers from 28 August to 6 September from 8 am to noon and 1 pm to 5 pm. The road will remain open to traffic thanks to a manual traffic control system during the day and two-way traffic at night.
During this period, the electric bicycle station on Boulevard des Moulins will not be accessible and bus routes will be diverted to Avenue Saint Laurent. A temporary bus stop will be created at 7 Avenue Saint Charles.
See also
Related news

Blue Economy & Finance Forum and the State Visit of the President of the French Republic: what Traffic arrangements are planned?

Renovation work at the Casino car park from 26 May to 9 June 2025
